Trigger Required Stormwater Inspections After Rain Events
Construction and industrial sites must inspect stormwater controls after qualifying rain events, and missed inspections mean violations. Detect qualifying rain and trigger the required inspections.
- 1
Monitor Rainfall
Add a
Schedule Triggerchecking rainfall against the qualifying threshold per site. - 2
Detect Qualifying Events
Flag when accumulated rain triggers the inspection requirement.
- 3
Assign the Inspection
Add a
Slacknode dispatching the required inspection within the deadline window. - 4
Log Completion
Record the inspection for the compliance file.
- 5
Activate and Test
Activate the workflow with a qualifying test rain. Confirm the inspection triggers.
Frequently asked questions
Why automate this?
Qualifying rain events are easy to miss, and the inspection deadline is short — automatic triggering ensures compliance.
Documentation?
The rain-event-to-inspection record is exactly what regulators check — the trigger builds the audit trail automatically.